Our fully accredited teams are approved by Local Highway, Water and Drainage Authorities.
· Site clearance and preparation
· Fully qualified in-house traffic management setup
· Road and footway construction to adoptable standard (Section 38)
· Surface and foul water sewers to adoptable standards (Section 104/106 Agreements)
· Highway improvements (Section 278/62)
· Drainage works
· Culverts and headwalls
· Service mains and duct laying works
· Infrastructure works including service and ducting
· Kerbing
· Pump stations and wet wells
· Hydro brakes
· Surface water attenuation and tank systems
· Sewerage connections to Local Authorities’ standards
· Shuttering formworks (retaining walls, foundations, columns)
· Steel fixing
· Interceptors and bypass separators
· Road surfacing
· Sea defences
Our Plant is fully equipped with GPS (Trimble Earthworks) which along with our fully trained and competent machine operators offers efficiency and precision of the proposed works. We are often employed as the Principle Contractor for the early stages of a development enabling the developer to arrive on site with infrastructure and oversites already installed. This enables the developer to commence super structure works immediately on their arrival.